(1) (a) What is the status of the pipeline between the Medupi Power Station and Mokolo Dam, (b) why has this pipeline been delayed, (c) what is the final specification of this pipeline and (d) has this specification been altered; if so, why; (2) (a) what is the status of the pipeline between the Mokolo Dam and Hartebeespoort Dam, (b) what is the quantity of water that this pipeline will be transferring in respect of each month at full capacity, (c) how long will it take, pumping at full capacity, to empty the Hartebeespoort Dam and (d) where will supplementary water come from when the Hartebeespoort Dam is empty; (3) is the construction of the Medupi Power Station dependent on further dam builds; if not, why not; if so, when will these dams be completed; (4) (a) what is the quantity of water that the Medupi Power Station require in respect of each month in (i) winter and (ii) summer to (aa) function efficiently and (bb) comply with the World Bank Covenants, (b) what is the quantity of water that is locally available and (c) what is the expected water shortfall; (5) (a) what is the quantity of water that will be required to wash the coal for the Medupi Power Station in respect of (i) each year and (ii) ton of coal and (b) has a water conciliation been completed at the Medupi Power Station; if not, why not; if so, (aa) by who, (bb) what is the total cost of the coal washing plant at the Medupi Power Station and (cc) what will be the monthly operating cost of the coal washing plant?