(1) With reference to his reply to question 2243 on 4 September 2018, what are the (a) names of the (i) two coal independent power pf0ducers (IPPs) that the Government contracted before the tabling of the draft 2018 Integrated Resource Plan (IRP) and (ii) shareholders of each of the lPPs and (b) values of the contracts awarded to each specified IPP;
(2) what is the projected cost of including the lPPs in the 2018 IRP,
(3) on what basis was the Minisferial Determination made to deviate from the low-cost scenario and to proceed with the procurement of electricity from the IPPs?