Ntabeni Construction Company was subsequently awarded a contract to continue with the project. However, the contract was terminated due to inferior workmanship and because the company had used corrugated iron. MMS Building Company was awarded the contract and constructed 410 units each measuring 40 m (two-bedroomed house) with a tiled roof. Each house had running water, a toilet, a shower and a basin. However, the other part of the settlement was still without water supply or connection. This problem was attributed to the theft of water pipes. During the time of the oversight visit, the project had stalled.