The school faced a challenge of infrastructure, with 2 blocks of classrooms having visible cracks. It also had a block of prefabs which were too hot in summer and too cold in winter and suffered from leaking roofs posing a danger to learners. The Committee learnt that the Department of Public Works visited the school in 2011 to conduct a full assessment of the school buildings, but to date nothing significant came out of it. Although the school had adequate access to water and electricity, some toilets were in a terrible condition. The school experienced regular burglary due to inadequate fencing. The school lacked a library, a computer laboratory and a strong room for the safekeeping of computers.