. 265 slabs; . 148 wall plates; . 102 completed houses that had been handed over; . 150 completed toilets;. . In terms of the civil engineering infrastructure construction, the work was almost 95% complete with the total length of road being 5,24km and the total length of bulk water line being 9,4km.