Housing delivery was initiated in 1997 and resulted in the Incotshane Housing Project with 215 units completed in 1998. These units were 32 square metres in size and included two bedrooms and a kitchen/lounge. The toilet was located on the outside and all units were equipped with a waterborne sewage system. Building blocks were produced by the local community under the supervision of a project manager. The material used was sub-standard. The Nu-Tec roofing was too light and could not withstand hailstorms.