(a) How many boreholes did each municipality (i) drill, (ii) repair and/or (iii) upgrade since 1 October 2015, (b) what is the exact GPS location of each of the specified boreholes, (c) what were the costs of (i) drilling per meter and/or (ii) refurbishment in each case and (d) was water found at each of the boreholes?