The housing units were called new generations. There were 18 out of the 21 units completed with VIP toilets installed and water was available. The toilet was designed in such a way that when it was full they can dig a pit next to the full one, move the top structure, and cover the new pit. Another one is to provide the chemicals that will help to decompose the solid waste. Eskom was also called in to provide electricity.