With reference to the preliminary report received by the Department of Justice on the structural defects pertaining to the Palm Ridge Magistrates’ Court Building in Gauteng, which advised that a further and full investigation by a structural engineer was called for on an urgent basis in order to ascertain with certainty whether the structural deficiencies of the specified court building were of such a nature that it was no longer safe to use, what steps have been taken (a) to source on an urgent basis such further report by a structural engineer and (b) in the meantime to ensure adherence to health and safety standards at the building?