(1) (a) What are the names of each of the proposed sites where the new nuclear power plants will be built and (b) where are each of these sites located; (2) whether any environmental impact assessments have been done at each of these sites; if not, why not; if so, (a) when and (b) what were the detailed findings of these assessments; Friday, 24 July 2015 935 INTERNAL QUESTION PAPER: NATIONAL ASSEMBLY NO 24 - 2015 (3) in respect of each of the proposed sites, are there currently transmission lines in place to connect the power generated from the nuclear power station to the national power grid?