(1) What (a) total number of boreholes for the provision of water are in each town in the Dr Beyers Naudé Local Municipality, (b) number of the boreholes are not working optimally, (c) are the plans have been put in place for the repairs to the boreholes that are not working, (d) are the time frames for the repairs to restore the boreholes to operation.
(2)whether the telemetry system for each town is fully operational; if not, why not; if so, what are the water losses recorded and reported by the municipality?