By what date does she envisage will the (a) road connecting Verkeerdevlei with Thaba Nchu be tarred as this provides the shortest access to Thaba Nchu from the N1 and (b) R703 road linking the N8 with the N1 be fixed, particularly the pothole riddled section between Verkeerdevlei and Excelsior?