(1) What (a) is the projected total cost of the temporary repairs to the flue ducts of the Kusile Power Station to get Units 1, 2 and 3 online and (b) effect will the temporary repairs have on emissions from the specified units;
(2) Whether Eskom has received a waiver on the emissions in terms of the commitment to the reduction of sulphur dioxide emissions; if not, why not; if so, what are the relevant details;
(3) What is the projected cost (a) to address the design defect at Kusile Power Station and (b) for permanent repairs to the flue ducts to ensure optimal usage of the gas desulphurisation plant? NW4284E