To meet basic safety requirements, the province required improvements to the value of R 5.317 billion. Thus currently the waiting period for schools to reach basic safety requirements was more than 5 years. To operate at minimum functionality, improvements to the value of R 20.358 billion would be required, whilst to reach a level of optimal functionality, R 35.210 billion was required.