5. Clause 5(d) amends section 24(5)(bB) and was inserted to allow the Minister or the MEC, in concurrence with the Minister, to lay down the procedure for the preparation, evaluation and adoption of the instruments referred to in section 24(2)(c),(d) and (e), including criteria or conditions to be included in such instruments. This power is to be distinguished from the regulation-making power in section 24(5)(bA), which relates to environmental management instruments that are considered when decisions are made, for example, when an environmental authorisation is issued.