3.4.1. The 1.5 million litre water reservoir is currently being built in Mokgalwaneng and funded by the DRDLR. The project will cost R 3 924 963.57. The rational for constructing the reservoir was that the area of Mokgalwaneng, Matlametlong and Disake depended on three boreholes which could not produce enough water, furthermore the water quality was poor as the water contained high quantities of lime. A lime softening unit is also being built as part of the reservoir project, to address the concerns raised about the high lime deposits in the water.