1. Outcome 1: Providing an effective and integrated infrastructure network that serves as a catalyst for social and economic development . Production of a Research Report Outlining the Cost of Doing Business in the Transport Sector A task team for the cost of Logistics Study Framework was established and the macro-economic and industry analysis reports were finalised. However, the research report outlining the cost of doing business in the transport sector could not be produced by 31 March 2011. At the time of tabling its Annual Report, the Department stated that the analysis was taking longer than anticipated due to consultation with stakeholders. . Development of a Proposal for a Mobile Weighbridge Unit The pilot mobile weighbridge unit at the Durban-Gauteng corridor was not rolled-out. This activity was reportedly transferred to the South African National Roads Agency Limited (SANRAL).