(1) (a) How many wells have been drilled by PetroSA at the Ikhwezi gas field, (b) what is the total time that has been spent drilling and (c) what is the total cost of drilling the wells; (2) what was the cost of laying equipment on the sea bed for the first well at Ikhwezi?