(1) In respect of the refit of the SAS Amatola, what is the (a) name of (i) the chairperson, (ii) each specified executive director and (iii) each specified non-executive director of each company and (b) company name of each specified entity contracted to carry out the refit; (2) how long will the (a) ship be in the dry dock and (b) refit take; (3) whether a study was done on the impact of the refit on employment in the local ship building and repair industry; if not, why not; if so, what are the relevant details; (4) what is the (a) total cost and (b) breakdown of the costs of the refit; (5) why is the refit not being carried out in the SA Navy’s Dockyard in Simons Town?