(1)For each of the bids that closed on 17 June 2016 for the construction of 10 new technical vocational education and training college campuses, (a) where will each campus be situated, (b) what is the maximum number of students that will be accommodated at each campus, (c) what is the current status of the bids and/or the contracts and (d) what is the estimated cost of each bid;
(2) on what date is it expected that each campus will be ready to enrol students;
(3) has her department provided for the equipment and staff that will be needed to utilise the sites; if so, what is the estimated cost for (a) furnishing and/or equipping the training sites and (b) the annual operation of each campus?